Skip to main content. 386,258 a) Lateral fees are based on the meter size, and are only per building. Commercial - For a complete listing of Road Impact Fees, please visit the Fee Schedule. Lines 6" or greater in diameter shall be installed by contractor. 2018 Tap Fee Process and Schedule Tap Fees for New and Updated Water/Sewer Taps Tap Fees (System Development and or Plant Investment) are charged for all new water connections and may be charged for changes to current water connections. a) Lateral fees are based on the meter size, and are only per building. 9,638 605,028 Effective July 1, 2018($) 0 see note 6a 3,750 see notes 1&2 Availability Fee This is an additional tap fee based on the size of the water meter serving a property that is connected to the Big Dry Creek Interceptor Basin. 50% Water with a Conservation Blue 0 Plant Investment). 3,500 see note 4 Create an Account - Increase your productivity, customize your experience, and engage in information you care about. • Depending upon the location of the project, additional water fees may apply due to agreements between the City and developer. 10 3/4 The City of Fountain charges a one-time water tap fee to all contractors/builders, property owners or annexed entities (residential or commercial) wanting to tap into the City's water infrastructure system. 5/8 * … For a list of all other fees for the Water District, Click here, or the Sanitation District, Click here. 71,634 Availability FeeEffective July 1, 2017($) Availability FeeEffective July 1, 2018($) The cost of a building permit includes, but is not limited to: the building permit fee, sales tax and plan review fees. Contact St. Vrain Valley School District Directly. 0 1,035,238 12   3,750 see notes 1&2 6 Frederick Water to furnish and install service line and meter box assembly to edge of Frederick Water easement or VDOT right-of-way.– Fee includes up through sixty linear feet of service line; service line greater than sixty linear feet shall be invoiced at cost plus ten percent. 9,638 For questions or to report problems: (540) 868-1061, Frederick Water© 2021 All rights reserved.Mailing Address: PO Box 1877, Winchester, VA 22604Physical Address: 315 Tasker Road, Stephens City, VA 22655Phone: (540) 868-1061Hours of Operation - Privacy, Language Assistance Available 17,228 22,163 6,742 Water Quality conducts quality testing on 12,500-plus samples for water and wastewater treatment compliance each year. 437,937 8 2 210,791 36,916 Multifamily 3,500 see note 4 Water and Sewer Allocation and Impact Fees, § 25. 6″      $14,410 see note 3 Cash in Lieu / Acknowledgement and Receipt for Payment. MeterSize(inch) see note 3 6,153 Availability Fee Availability Fee 1,035,238 Water. Recommended updates to water and wastewater tap fees 3. Rate revenue adjustment for separate water and wastewater 2,117,237 Español | The vault would be the responsibility of the developer/owner and would be subject to inspection by Frederick Water. English. Water tap within Town limits $6,000.00 Water tap outside Town limits $9,000.00 Sewer tap within Town limits $4,000.00 Sewer tap outside Town limits $6,000.00 */ 93,812 34,302 62,288 9,412 If you need additional information regarding building permit fees or assistance calculating fees, please contact Building Inspection at (303) 651-8332 or building.inspection@longmontcolorado.gov . COVID-19 Information, Resources, Town Updates, Commercial Multifamily and Single Family Attached, Single Family & Town Home from a Master Plan, Electrician Contemporaneous Review Guidelines, Plumber Contemporaneous Review Guidelines. But even in arid states such as Arizona, tap fees on … 0 The vault would be the responsibility of the developer/owner and would be subject to inspection by Frederick Water. 302,324 Commercial $0.488 x square footage of the building and parking area. 3,845 see note 3 繁體中文 | 7,500 see notes 1&2 3,500 see note 4 FCSA($) 71,634 2021 WATER TAP FEES. 87,203 475 see note 1 In addition, as now a backflow prevention device would need to be installed between the vault and the building as approved by the county building code department and Frederick Water. Frederick Water to furnish and install 5/8″, 3/4″, 1″, 1-1/2″ & 2″ meters. b) The availability fee is calculated to be eighty percent of the availability fee for the 5/8-inch meter. Multi-Family dwelling units pay the listed availability fee per each dwelling unit. 79,044 6 493,721 3,500 see note 4 10 6 Frederick Water to furnish and install service line to edge of Frederick Water easement or VDOT right-of-way.– Fee includes up through sixty linear feet of service line; service line greater than sixty linear feet shall be invoiced at cost plus ten percent. 169,379 3,076 In addition to the fee, any service would require the installation of a detector meter located within a vault adjacent to the right-of-way or property line as shown on the diagram attached. Contact the TAP Application Office at 303.739.7393 or 303.739.7395 if you have questions regarding fees for a particular project. 128,291 Français | na 12″     $30,000 b) The availability fee is calculated to be 80% of the availability fee for the 5/8-inch meter. 4 30,764 118,651 Lines 6" or greater in diameter shall be installed by contractor. 1 17,262 Contractor to furnish line, meter vault, and meter per Frederick Water requirements.   1 1/2 Availability Fee 1 1/2 3 Effective March 1, 2020 . In addition, as now a backflow prevention device would need to be installed between the vault and the building as approved by the county building code department and Frederick Water. 11,292 Online Bill Pay:If payment is to avoid disconnection of service, you must contact Town Hall at 303-833-3291. 0- see note 5 14,015 2,461 The tap fee is an additional fee to physically connect to the system. 386,258 This tap fee charge is based on the size of the meter to be used. 27,771 These enterprise funds are used exclusively to support the cost of providing the service. Water bills will include a base rate plus a usage rate (excluding bulk fill customers). 10″     $26,760 6,742 Continue to pursue grant opportunities 4. 4 3,500 see note 4 A minimum charge of four hours is assessed for service requests outside of normal business hours. Frederick Water to furnish and install 5/8″, 3/4″, 1″, 1-1/2″ & 2″ meters. b) The availability fee is calculated to be eighty percent of the availability fee for the 5/8-inch meter. Larger sizes will be computed upon customer request for connection. But that is certainly no grounds for celebration. 4″      $10,380 Lines 6″ or greater in diameter shall be installed by contractor. 0 a) Lateral fees are based on the meter size, and are only per building. Contractor to furnish line, meter vault, and meter per Frederick Water requirements. Water. 0- see note 5 10 The plan review fee is 65% of the building permit fee. As of January 1, 2021, the FCLWD board passed a resolution to increase monthly service charges and tap fees. Multi-Family dwelling units pay the listed availability fee per each dwelling unit. na 日本語 | Proof of sewer tap purchase from St. Vrain Sanitation District will be required before a building permit will be issued. Additional charges for water meter, yoke, corporation valve, curb stop valve, tapping saddle and labor. Domestic/Production Fees 0- see note 5 0 Lines 6″ or greater in diameter shall be installed by contractor. Plant Investment Fees (PIFs) Also known as Tap Fees, PIFs must be paid prior to building permit approval. 1,473,468 For more call 303-926-2780. Water and Sewer Tap Fees. Normal business hours are 7:30 a.m. to 3:30 p.m. Monday through Friday plus an hourly rate for each hour over the minimum. 0 0 4 290 see note 1 12 14,115 210,791 3,500 see note 4 Multi-Family dwelling units pay the listed availability fee per each dwelling unit. 2 Frederick Water to furnish and install 5/8″, 3/4″, 1″, 1-1/2″ & 2″ meters. na 2,461 3,750 see notes 1&2 Water Service maintains 2,500 fire hydrants, 18,000-plus water meters, and 211 miles of water distribution mains and services up to private property lines. see note 3 Frederick Water. 1 437,937 The Town's public water utility is a cost-based entity that relies solely on user fees to operate. 1,129,193 Estes Park Tap Fee Study, February 2016. The Fee Schedule is based on the Table 1A from the 1997 UBC. They have six water storage tanks plus 6.75 million gallon capacity. MeterSize(inch) 3/4 0- see note 5. 0 1,129,193 2″       $7,450 3 Capital improvement plans for water and wastewater utilities 2. 0- see note 5 b) The availability fee is calculated to be eighty percent of the availability fee for the 5/8-inch meter. 1,473,468 Tiếng Việt | 323,017 Leaks inside the toilet can waste up to 200 gallons of water a day. 7,500 see notes 1&2 Home; Board of Directors; Staff; Forms/Documents. 한국어 | Italiano | Availability FeeEffective July 1, 2018($) 22,499 12 b) The availability fee is calculated to be eighty percent of the availability fee for the 5/8-inch meter. 414 S Hawthorn Street Frederick, CO, 80530, lot/land currently listed for sale at $142,000. 3,500 see note 4 27,771 Effective July 1, 2017($) Effective for billing periods beginning Jan 1, 2020 or later. Building Fees (Mechanical, Plumbing, Electrical) The Building Division is responsible for Building Fees. ... a) Lateral fees are based on the meter size, and are only per building. Note: Tap fees and Water Rates are subject to change at any time by the Longs Peak Water District Board of Directors. FCLWD and SFCSD Tap Fee Schedule effective 1.1.21 see note 3 Others($) 588,411 0 Effective July 1, 2019($) Others($) 8″       $18,900 106,391 14,284 Multi-Family dwelling units pay the listed availability fee per each dwelling unit. 1 0 0 461,453 Residential Building Permit Valuation Fees. 13,892 Multi-Family dwelling units pay the listed availability fee per each dwelling unit. 17,228 6 14,115 3,750 see notes 1&2 449,498 Fees are set according to what is needed to cover the actual cost of the service. Availability FeeEffective July 1, 2017($) 56,673 Complete the Clifton Water District Water Service Agreement Pay the current Plant Investment Fee for new water service To expedite the process, the following Water Service Agreement Form and Plant Investment Fees are provided so that a Property Owner can complete the Water Service Agreement prior to coming to the office. 11,292 Sewer 3,750 see notes 1&2 0 In addition, as now a backflow prevention device would need to be installed between the vault and the building as approved by the county building code department and Frederick Water. 169,379 0 13,892 see note 3 705,746 7,500 see notes 1&2 Utilities in Frederick County are offered by various agencies and companies. 22,163 12″     $30,000 22,499 275 see note 1 MLS #4982927 5/8 605,028 0- see note 5 275 see note 1 11,292 If the plan is a repeat of a master plan, the plan review fee is $500.00. North Weld County Water District (NWCWD) has been serving its customers in northern Weld and eastern Larimer counties since 1962. 0- see note 5 see note 3 533,241 Regardless of assessment, all fees are due at the rate in effect at the time of payment. Polski | 5/8 na As reported April 25 by The News-Post, Frederick’s tap water did not violate any health standards in 2017. 3/4" water meter requires a 4" sewer tap and a 1" to 3" water meter requires a 6" sewer tap. Frederick Water to furnish and install service line and meter box assembly to edge of Frederick Water easement or VDOT right-of-way. Minimum Fees are by tap sizes in inches. 14,015 Permit Fees - fee to administer, review and inspect building, electrical, gas, mechanical and plumbing work. 3,076 Mulitfamily In addition to the fee, any service would require the installation of a detector meter located within a vault adjacent to the right-of-way or property line as shown on the diagram attached. see note 6a Wastewater connection fees are the sum of the Wastewater Plant Investment Fund (PIF) and the Tap Fee for parts and labor. 10 0 Water and Sewer. a) Lateral fees are based on the meter size, and are only per building. FCSA($) 0 11,292 No Restrictions: If Qualified, taps may be used in combination with Conservation Blue Tap (i.e. 275 see note 1 533,241 7,500 see notes 1&2 3,500 see note 4 Availability FeeEffective July 1, 2019($) On July 1st, 2012 the ordinance for Water and Sewer Allocation and Impact fees were combined per Frederick City Code, Article 9. 3,076 8″       $18,900 Potable (Treated) water for all property located within the town boundary east of I-25 – some areas are served by Central Weld County Water District lines through an intergovernmental agreement with the Town. In addition to the fee, any service would require the installation of a detector meter located within a vault adjacent to the right-of-way or property line as shown on the diagram attached. Lateral Fee – installed by Others($) 274,216 3/4 14,115 Utilities performs water and sewer main line taps within the city district. 2 1,482,066 28,230 - Increase your productivity, customize your experience, and engage in information you care about. Lines 6″ or greater in diameter shall be installed by contractor. Sewer. 1 1/2 0 1 1/2 14,115 3,076 705,746 Deutsch | Potable (Treated) water for all property located within the town boundary east of I-25 – some areas are served by Central Weld County Water District lines through an intergovernmental agreement with the Town.